Skip navigation |
NGT home
[Viewing Options]

NGT South Route

Map showing the proposed NGT south routeThe South Route would start at a new Park & Ride site at Stourton, near the intersection for the M1/M621 (at junction 7 of the M621), and would travel into Leeds through Hunslet and Clarence Dock.

The map to the right shows our preferred route in orange, or you can view a larger aerial map (jpeg) of the route.

Our preferred route starts at the Park & Ride site, it then diverts from the A61 along a new ‘NGT-only’ link road next to the railway line, before passing Hunslet District Centre.

Key issues:

  • Slightly longer route, but faster and more reliable;
  • Provides a new public transport service around Pepper Road;
  • Directly serves Hunslet District Centre;
  • Dedicated link road would result in some loss of land from allotments, recreational areas and land along the railway boundary; and

The images below show Hunslet Penny Hill as it looks now (on the left) and as it could look.

Images showing Whitworth Square, Penny Hill Before and After NGT Construction

NGT proposals